Financing land acquisition and construction through a single loan is one of the most powerful tools in a developer’s toolkit, it eliminates a separate land loan, reduces transaction costs, and consolidates two complex financing events into one. This guide covers combined land-and-construction loan structures, who offers them, and how to qualify.

How Combined Land and Construction Loans Work

A combined land acquisition and construction loan finances both the land purchase and the subsequent construction under a single loan facility. The structure works as follows:

  1. At Closing: The land acquisition portion funds in full. The construction budget is established as a future advance commitment.
  2. During Construction: Funds are disbursed in draws as construction progresses and is verified by inspection.
  3. At Completion: The total loan reflects both the land cost and construction draws. The project exits via sale or permanent refinance.

Key Loan Parameters

Parameter Typical Range
LTC (Total Project Cost) 65–80%
Land Advance (at close) 50–70% of land value
Construction Advance Up to 75–80% of hard costs
LTV (As-Completed / As-Stabilized) ≤70–75%
Loan Term 18–36 months
Rate Structure Floating (SOFR/Prime + spread)
Interest Accrual Drawn balance only (not full commitment)

Looking for Commercial Financing?

Tribune Funding works with a nationwide network of private lenders, debt funds, and direct capital sources. Tell us about your deal and we’ll match you with the right financing.

Apply for Financing →

Lender Options for Land + Construction Financing

Lender Type Combined Loan Available Loan Size Rate Range Notes
Community / Regional Banks Yes (most common source) $500K – $10M 7.50% – 9.50% Full documentation; relationship-based
Private / Hard Money Lenders Yes $100K – $5M 11.00% – 14.00% Fast close; asset-based; minimal docs
Debt Funds Yes (mid-size+) $2M – $50M 9.00% – 11.50% Institutional; experience required
Credit Unions Sometimes $250K – $3M 7.50% – 9.00% Membership required; geographic limits
SBA 504 Yes (owner-occ only) Up to $5M CDC 6.00% – 7.50% Must occupy 51%+ of finished building

Using Owned Land as Equity

If you already own the land free and clear, its value counts as equity toward your construction loan, often eliminating the need for additional cash equity injection at closing.

How Lenders Calculate Land Equity Credit

Scenario Example
Land Value (appraised) $600,000
Total Project Cost (land + construction) $3,000,000
Construction Budget $2,400,000
Max Loan (75% LTC) $2,250,000
Land Equity Credit $600,000
Additional Cash Equity Needed $150,000

In this example, the borrower owns $600K in land equity, which covers most of the required 25% equity injection, only $150K in additional cash is needed to close a $2.25M construction loan. This is the single most powerful equity tool available in development finance.

Important: Lenders use the appraised value of the land, not the purchase price. Land purchased years ago at below-market prices may have appreciated significantly, creating substantial equity that the borrower can bring to the table.

Qualification Requirements

For Land with Existing Entitlements (Shovel-Ready)

  • Approved building permits (or close to final approval)
  • Completed architectural plans
  • Signed GC contract with cost breakdown
  • Title insurance commitment
  • As-completed appraisal
  • Borrower experience (1–3 projects for institutional lenders)
  • Credit: 640–680+ depending on lender
  • Liquidity: 10–15% of total loan amount post-close

For Raw Land (Entitlements Pending)

Raw land without entitlements is significantly harder to finance, most construction lenders won’t commit to a combined facility until entitlements are in hand or imminent. Options for un-entitled land:

  • Hard money land loans (50–60% LTV, 12–24 months) while pursuing entitlements
  • Seller financing / seller carryback through the entitlement process
  • Option contract, control land with minimal capital until entitled
  • Then refinance into a combined land-construction loan once entitled

Combined Loan vs. Separate Land + Construction

Factor Combined Land + Construction Separate Land Loan + Construction Loan
Number of closings 1 2
Closing costs Lower Higher
Flexibility Less (committed to one lender) More (can shop each phase)
Land financing leverage Part of blended LTC Up to 65–70% on land alone
Rate on land portion Construction rate (higher) Land-specific rate (may be lower)
Speed One close, faster overall Two processes
Best for Entitled land + ready to build Land needing entitlement period

Frequently Asked Questions

Can I use the land I already own as a down payment for a construction loan?

Yes. Land owned free and clear is typically credited as equity toward the construction loan at its appraised value. This can reduce or eliminate the additional cash equity required at closing. The lender will order an appraisal to confirm current market value, and that value counts toward your equity contribution in the LTC calculation.

Do I need building permits before getting a land and construction loan?

Most institutional lenders require permits in hand or near-final approval before closing a combined land-and-construction loan. Hard money lenders may close with permits pending, though they typically hold back construction funds until permits are issued. Having permits dramatically expands your lender options and improves your rate.

What is the maximum LTC for a combined land and construction loan?

Most combined land-and-construction loans go to 70–80% LTC (loan as a percentage of total project cost including land). Hard money lenders may go to 85% LTC on small residential projects. The as-completed LTV (loan as percentage of finished property value) is typically capped at 70–75% by most lenders as a separate constraint.

Related Guides

Ready to Move Forward on Your Deal?

Tribune Funding connects borrowers with the right lenders for commercial real estate, construction, hospitality, office, and mixed-use projects. Loans from $500K to $50M+.

Submit Your Loan Inquiry

No obligation. Response within 1 business day.